La Cadena Industrial Park

Our team successfully completed the installation of a new carbon black standing seam metal roof at La Cadena Industrial Park, covering a total area of 4,200 square feet. The panels were provided by Majestic Metals.

Overview

The project involved removing the existing wood and composite shingle roofing systems, preparing the roof deck, and installing the new standing seam panels to ensure exceptional weather resistance and energy efficiency while providing a sleek, modern appearance for the industrial park.

Working across multiple buildings, the project required careful staging, material logistics, and tenant coordination to minimize disruption. Despite this, the team delivered a high-quality result on time and combining aesthetic appeal with improved performance and durability.

The project was completed over an estimated 4-month timeline from early April to late July, with minimal disruptions to the residents.

The final result reflects a robust, long-lasting roofing system that is tailored to protect residents for decades to come while elevating the overall appearance and durability of the entire apartment complex.

The project was completed in just over 2 weeks with no disruptions to the tenants on site.

10 Year Warranty Guarantee provided by Ramon Total Roofing

Location

La Cadena

Roof Type

Metal Roof

Project Size

4,200 sq. ft.

Duration

2 Weeks

Completion Date

In Progress